Cowling Hold Down Strip, Fiberglass Practice
Monday, January 17, 2011
Craig, Jo, and Patrick were positioning the three holes on the upper cowling hold down strip.
Read more…
ELT Plate, Wiring – Fuel Pressure, Alternator, Capacitor, ELT, Bundled and Secured Wires
Friday, January 14, 2011
Joe stripped and then attached the fast-on connectors for the fuel pressure wires for the Dynon EMS.
Read more…
ELT Plate, Wiring – ELT Remote Switch
Friday, January 14, 2011
We soldered the Kannad RC102 remote switch and mounted it in the panel. All the holes in the panel are filled:)
Read more…
Cowling, Wiring – Fuel Flow
Wednesday, January 12, 2011
This is the finished Electronics International FT-60 “Red Cube” fuel flow sender. It is installed after the fuel pump and before the “y” in the fuel line. We used large fire sleeve to protect the…