Chevak School Rans S-6S

Work continues…

upper cowling hold down stripCowling Hold Down Strip, Fiberglass Practice
Monday, January 17, 2011
Craig, Jo, and Patrick were positioning the three holes on the upper cowling hold down strip.
Read more…

ELT Plate, Wiring – Fuel Pressure, Alternator, Capacitor, ELT, Bundled and Secured Wires
Friday, January 14, 2011
Joe stripped and then attached the fast-on connectors for the fuel pressure wires for the Dynon EMS.
Read more…

ELT Plate, Wiring – ELT Remote Switch
Friday, January 14, 2011
We soldered the Kannad RC102 remote switch and mounted it in the panel. All the holes in the panel are filled:)
Read more…

Cowling, Wiring – Fuel Flow
Wednesday, January 12, 2011
This is the finished Electronics International FT-60 “Red Cube” fuel flow sender. It is installed after the fuel pump and before the “y” in the fuel line. We used large fire sleeve to protect the…
Read more…

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.